WHAT DO I GET WITH EVERY STEEL FRAMED NUECO BUILDING KIT?

  • Our metal building kits include complete structural engineering. This engineering will include the foundation slab, piers, and any other requirements for your steel building design. Building options can include steel "rollup" & "overhead doors", steel access doors, insulation, roof overhangs and a wide range of color choices.

    WHERE DO WE START TO GET OUR STEEL FRAMED KIT GOING?

  • First, reach out to one of our success NuEco team members here.
  • Share with us the desired type & use for the proposed building.
  • We then discuss the style of building that most appeals to you and provides what you need.
  • We then discuss size, local building requirements, color, and delivery.
  • You provide us with your property address so that we can do a quick property check for local building requirements...This may take up to 24 hrs.
  • After a preliminary determination that the building you desire can be built on your property, we work up a custom quote for you stating all that is included in the delivered price.
  • Upon your approval, the quote is sent to our engineer and the plans are drawn and stamped for your state.
  • The plans are returned to you to take to your local building department for approval.
    NOTE: We Can Often Assist You With This Process.
  • After approval the building is ordered and fabricated. During this time the concrete work can be completed by you or your local contractor.
    NOTE: We Can Often Help You Source a Contractor.
  • The building will arrive complete in 3-4 weeks.
  • You the buyer or a hired local contractor completes the erection of the building.
    NOTE: We Can Often Help You Source a Contractor.
  • We supply complete foundation, framing & structural plans and an easy assembly manual, as well as a step by step videos series.
  • Our buildings bolt and screw together. NO WELDING REQUIRED.

    WHAT STEPS DO I TAKE AS THE PROPERTY OWNER TO COMPLETE THE PROCESS?



    YOU WILL NEED TO GET A SET OF PLANS TO INCLUDE THE FOLLOWING
  • Electrical, Plumbing and Mechanical
  • Doors, Windows, & Appliances Schedules.
  • A Project Site Plan.
  • Title 24 Energy Code Certification Report...If Required.
  • NOTE: We Can Often Assist You With This Process.

    HOW MANY PHASES ARE THERE TO GET A SET OF PLANS
    READY TO BE SUBMITTED TO THE BUILDING DEPARTMENT?

    On Average 5-6

    • Phase 1: Project setup and preliminary site plan sheet.
    • Phase 2: Floor plan, elevations and general architectural sheets.
    • Phase 3: Mechanical, electrical, plumbing and architectural spec sheets.
    • Phase 4: Project review, site calculations, general notes.
    • Phase 5: Structural, framing, foundation detail sheets.
    • Phase 6 If Required: Finalization of plans and preparation for submission to third party title 24 certification and local planning & building departments.
    * ** Services may be sourced through NuEco or directly from providers on an as required basis. Pricing for such services is determined by third party providers. *** This service is only available for order once an ADU Kit has been ordered for the property. Pricing will be calculated depending on the requirements, style, location and complexity of the design. Not all properties will be offered this option, particularly if the report determines that, for example, variances are likely to be required for project approval, or requirements for the ADU project are substantially more customized than a standard residential design.

    We'll Design The Perfect
    Easy-Up ECO Friendly Steel Building
    for Your Existing Property!*


    *You Must Actually Own a Property for Us to Run Engineered Calculations for An Accurate Quote