Cold-formed steel (C- and Z-channel)
Lightweight galvanized or painted steel members, roll-formed from steel coil and bolted together on site. NuEco Steel Eco-Kits use cold-formed steel.
Building systems
Steel and wood buildings are framed in three main ways: cold-formed steel, structural steel (red iron) and post-frame (pole barn). Each suits different projects.
The right choice depends on how you will use the building, the span you need, your site conditions, local requirements and your budget. This page compares the three systems topic by topic.

Lightweight galvanized or painted steel members, roll-formed from steel coil and bolted together on site. NuEco Steel Eco-Kits use cold-formed steel.

Heavy fabricated steel main frames, often called red iron or pre-engineered metal buildings. Commonly used for large clear spans and commercial and industrial buildings.

Wood posts set in the ground or on footings, with engineered wood roof trusses. A long-established method for farm buildings and smaller buildings.
A summary of how the three systems typically compare. There is no single best system. It depends on your project.
Every building needs project-specific engineering and local approval. No system meets local code without it. Engineers are available in all 50 states. California projects are subject to case-by-case engineering review.
Spans and heights below are typical ranges. What is possible for your building depends on its engineering, loads and component availability.
Often used for barndominiums, barn homes, homes, cabins, ADUs, garages, shops, other outbuildings and commercial buildings. End walls up to 60 ft can often be accommodated. Above 60 ft is reviewed case by case, and a red iron structure may be required.
Lean-tos, mezzanine floors and overhangs can be added where the engineering allows. Cold-formed steel provides steel framing at a much lower weight than structural steel members.

Can be built at almost any size, and typically becomes more economical as spans increase beyond about 50 feet. Suited to very large clear spans, such as big-box retail buildings, tall buildings, buildings with overhead cranes, large unsupported overhangs, open riding arenas, and projects that need very large doors, such as airplane hangars.

Typically used for spans of about 24 to 60 feet, with eave heights typically up to about 16 feet. Wider spans and large doors tend to add cost, so post-frame is often chosen for smaller, more domestic buildings, such as barn homes and smaller commercial buildings.

How components are made and delivered affects lead time and the equipment you need on site. Example weights are approximate and depend on the section.
Cold-formed components are produced in factories with roll-forming machines, which shape large steel coils into C- and Z-sections. Kit delivery is 4 to 6 weeks on average. See the steps to ordering.
Components can usually be unloaded with a forklift. Example: a 16-foot post (column) weighs roughly 97–117 lb, depending on its size.

Main frames are fabricated in large factories with cranes, heavy machinery and welding equipment. Secondary framing (purlins and girts) is roll-formed. Lead times vary by supplier and are often quoted at around 8 to 16 weeks.
Unloading often requires a crane or heavy forklift, depending on member size. Example: a 16-foot column weighs roughly 200–250 lb.

Post-frame buildings are partly factory-made and partly built on site. Roof trusses are built in factories with presses and jigs. Wall lumber is often supplied in random lengths that contractors cut on site. Lead times vary by supplier and are often quoted at around 6 to 8 weeks.
Unloading is usually done by forklift. Example: a 16-foot 6×6 Oregon pine post weighs roughly 122–142 lb.

Engineered foundation plans are drawings. The physical foundation is built by your local contractor for every system.
Cold-formed buildings bolt to the foundation (slab, piers or strip footing) with steel base plates and drill-in anchors supplied with the kit. The anchors are installed after the concrete is complete.
Engineered foundation plans are included with a Steel Eco-Kit. Cold-formed floors typically use around 20–25% less concrete than a comparable structural steel building. The actual amount depends on the engineered foundation design.

Structural steel buildings bolt to the foundation (slab, piers or strip footing), typically with cast-in anchor bolts. These are often not supplied with the building package. They are set before the concrete is poured, so accurate placement is critical.
Whether engineered foundation plans are included depends on the supplier. In many cases they come from a local structural engineer.

Wood posts are typically set in augur-drilled holes. The bottom of the hole may have a concrete pad for the post to sit on, and the rest is filled with concrete or compacted soil.
Whether the foundation is engineered depends on the supplier, the project and local requirements.

The finish on the framing affects corrosion and decay protection. How long any finish lasts depends on the environment, moisture exposure and maintenance.
Cold-formed members come with a galvanized or a painted finish. The galvanized zinc coating is applied at the steel mill and is part of the steel's protection against corrosion.


Structural steel usually has a painted finish, typically red, although other colors are available. On many buildings the paint is a shop coat intended mainly to protect the steel during transport and construction, and it can be damaged in handling. Coatings vary by supplier.


Lumber type, color, grain and surface (rough or smooth) vary across a building, as does moisture content. Post-frame lumber is typically treated with chemical preservatives against decay and insect damage.


Member sizes are set by engineering or code for each location.
Cold-formed components are engineered for the building location. Main frame members typically range from about 4 to 24 inches deep and 2½ to 5 inches wide, in gauges from about 16 to 10 gauge, depending on engineering.


Structural steel components are engineered for the building location. Main frame sizes vary with the design and can be very large, which is why structural steel is used for the largest spans.


Wood post-frame components are often sized from standard code tables that set the size, species and grade of lumber, rather than engineered for the specific building. Roof trusses are engineered. Some post-frame buildings are fully engineered, depending on the supplier and local requirements.
How the main frame is connected on site affects tools, labor and site work.
On site, cold-formed main frames are typically bolted and screwed together with pre-drilled plates. Some cutting, coping and drilling of braces may be needed on site.


On site, a structural steel main frame is typically bolted together with plates welded on in the factory. Some welding and drilling may be needed on site.


On site, a post-frame main frame is typically connected with steel fasteners and plates. Many connections are cut and assembled on site.


The shape of the main frame differs between the three systems. The red-line drawings are simplified diagrams, not engineering drawings.
The cold-formed frame consists of posts (columns), rafters, knee braces and apex braces. The columns and rafters are straight.


The structural steel frame consists of columns and rafters. They are typically tapered: narrower at the foundation and at the peak, and deeper at the rafter-to-column connection.


The post-frame consists of posts and trusses. The posts are straight, and the trusses form a triangle.


Illustrative examples for cold-formed buildings erected by an experienced crew of three. Actual time depends on the building design, crew, equipment, weather and site conditions.
| Building | Example erection time | Crew |
|---|---|---|
| 30′ × 40′ × 10′ gable roof | About 4 days | Experienced crew of 3 |
| 60′ × 80′ × 14′ gable roof | About 14 days | Experienced crew of 3 |
| 40′ × 50′ × 14′ American barn | About 15 days | Experienced crew of 3 |
Suitable erectors include wood carpenters, steel erectors and roofing contractors. Erecting a cold-formed building is less physically demanding than a structural steel building because the individual components are lighter.
More: Erection timeline in the FAQ · FAQ · Steps to ordering a Steel Eco-Kit
NuEco Steel Eco-Kits use cold-formed steel. They are commonly used for barndominiums, homes, cabins, ADUs, garages and shops, especially small to mid-size buildings. Structural steel may suit projects with very wide spans, tall walls or overhead cranes, and post-frame may suit some smaller wood-framed buildings. We can help you work out which fits your project.